[Yunnan Public Welfare Forest Project Commences] Recently, the pilot project of the Yangtze River Protection Public Welfare Forest in Wudongde Jinba District, Luquan County, Kunming City has officially started. The project plans to have a total investment of 200 million yuan and will be implemented in five phases. The investment for this phase is 29.8 million yuan, including plant planting, seedling irrigation, gully management, and electrical engineering construction. After the completion of the project, it can increase the area of forest land and vegetation coverage, enhance the soil and water conservation capacity of mountainous slopes, slow down local gully debris flow disasters, and help improve the vegetation restoration and ecological environment quality of the reservoir area. The operation, lifespan, and safety production of the Wudongde Hydropower Station reservoir area will have significant comprehensive ecological benefits. To provide new opportunities for the development of resources in the old, young, border, and poor areas of Yunnan and Sichuan provinces along the Yangtze River, and for the improvement of local people's lives. The demonstration forest area of the pilot village of this project is located on both sides of the external traffic road on the right bank of the Wudongde Hydropower Station, and is a gateway node for entering and exiting the Wudongde Hydropower Station. The construction of public welfare forests will sort out the barren mountains and wasteland suitable for forestry, showcase the project area's unique features and local red cultural resources, showcase the achievements of vegetation ecological restoration in the reservoir area, and play a demonstration and driving role in the construction of beautiful Wudongde. Editor/Zhao E
Click to view more instant >>
Latest
  • 2023.12.04 17:17
  • [Two departments regulate pumped storage power plants]
  • On December 1, the National Development and Reform Commission, the National Energy Administration issued the "Pumped storage power station development and construction Management Interim measures (draft for comments)" pointed out that the National Energy Administration under the guidance of the National Development and Reform Commission, the development of pumped storage medium and long-term development planning, proposed development goals, main tasks, project layout, construction timing, safeguard measures, etc., to guide the development of pumped storage. The key implementation projects of each five-year planning period proposed in the medium - and long-term development plan are the basic basis for the approval of pumped storage projects in all provinces (autonomous regions and municipalities). Editor/Xu Shengpeng
  • 2023.12.04 17:17
  • [Section right in the new energy base of one million kilowatts]
  • On November 30, the new energy base of Inner Mongolia Energy Department was approved. The project owner is Inner Mongolia Moneng Ke Youzhong Energy Co., LTD., the construction site is located in the territory of Keyouzhong Banner, the construction scale of 1 million kilowatts of wind power, the total investment of 4.5 billion yuan, is planned to be completed and put into operation by the end of 2025, after putting into operation, the annual power generation will reach 2,763 million KWH, saving 853,700 tons of standard coal and reducing 2,331,800 tons of carbon dioxide. Editor/Xu Shengpeng