[Tibet Airlines Lhasa New Operations Support Center Project Commences]On the morning of September 17, 2023, the commencement ceremony of the Tibet Airlines Lhasa New Operations Support Center project was held. It is understood that the construction site of the Tibet Airlines Lhasa New Operations Support Center project is 245 acres, with a planned total construction area of 52200 square meters. The construction content includes the maintenance support center, ground service support center, life service support center, and marketing and operation management center. After the completion of this project, it will further strengthen the operational support capacity of the base airline in all aspects and all chains, meeting the development needs of Tibet Airlines' 14th Five Year Plan. Editor/Zhao E
On December 1, the National Development and Reform Commission, the National Energy Administration issued the "Pumped storage power station development and construction Management Interim measures (draft for comments)" pointed out that the National Energy Administration under the guidance of the National Development and Reform Commission, the development of pumped storage medium and long-term development planning, proposed development goals, main tasks, project layout, construction timing, safeguard measures, etc., to guide the development of pumped storage. The key implementation projects of each five-year planning period proposed in the medium - and long-term development plan are the basic basis for the approval of pumped storage projects in all provinces (autonomous regions and municipalities). Editor/Xu Shengpeng
On November 30, the new energy base of Inner Mongolia Energy Department was approved. The project owner is Inner Mongolia Moneng Ke Youzhong Energy Co., LTD., the construction site is located in the territory of Keyouzhong Banner, the construction scale of 1 million kilowatts of wind power, the total investment of 4.5 billion yuan, is planned to be completed and put into operation by the end of 2025, after putting into operation, the annual power generation will reach 2,763 million KWH, saving 853,700 tons of standard coal and reducing 2,331,800 tons of carbon dioxide. Editor/Xu Shengpeng
Share
Perfect password
No password set, please get verification code settings