[Zhangjiajie, Hunan will launch a rail sightseeing project] On September 8, 2023, Hunan Railway Group signed a strategic cooperation agreement with the People's Government of Zhangjiajie City. The two sides will work together to create a tourism rail tourism project, helping Zhangjiajie create a world-class tourism destination and create an international boutique tourism city. The person in charge of Hunan Railway Group stated that it will fully leverage the integrated advantages of "finance, investment, construction, and operation" to create Zhangjiajie tourism rail tourism projects with the highest standards, and jointly promote the high-quality integrated development of Hunan rail transit and cultural tourism industry. Editor/Zhao E
Click to view more instant >>
Latest
  • 2023.12.04 17:17
  • [Two departments regulate pumped storage power plants]
  • On December 1, the National Development and Reform Commission, the National Energy Administration issued the "Pumped storage power station development and construction Management Interim measures (draft for comments)" pointed out that the National Energy Administration under the guidance of the National Development and Reform Commission, the development of pumped storage medium and long-term development planning, proposed development goals, main tasks, project layout, construction timing, safeguard measures, etc., to guide the development of pumped storage. The key implementation projects of each five-year planning period proposed in the medium - and long-term development plan are the basic basis for the approval of pumped storage projects in all provinces (autonomous regions and municipalities). Editor/Xu Shengpeng
  • 2023.12.04 17:17
  • [Section right in the new energy base of one million kilowatts]
  • On November 30, the new energy base of Inner Mongolia Energy Department was approved. The project owner is Inner Mongolia Moneng Ke Youzhong Energy Co., LTD., the construction site is located in the territory of Keyouzhong Banner, the construction scale of 1 million kilowatts of wind power, the total investment of 4.5 billion yuan, is planned to be completed and put into operation by the end of 2025, after putting into operation, the annual power generation will reach 2,763 million KWH, saving 853,700 tons of standard coal and reducing 2,331,800 tons of carbon dioxide. Editor/Xu Shengpeng